Cracking the 'WIP Effect' for Maximum Material Performance Print E-mail
User Rating: / 0
PoorBest 
Written by Michael Ford and Bruce Isbell   
Monday, 12 September 2011 09:55

The number one cause of downtime on SMT lines is related to material, as either a shortage or a logistical misstep that fails to place the right quantity of the right material at the right location at the right time. From a business perspective, the downtime caused by material problems is often the largest unplanned cost in the manufacturing operation. This paper will review many factors that contribute to the fundamental issue behind the chaos of material related downtime: inventory inaccuracy, and the steps needed to resolve this crucial problem.

http://www.mentor.com/pcb-manufacturing-assembly/techpubs/download/?id=70166&cmpid=6609


blog comments powered by Disqus
 

Columns

European RoHS Enforcement Explained

A series of workshops next month on compliance with RoHS and other directives will help US companies looking to break into the European market.

Read more...
 
Believing Foxconn Means Suspending Belief

The Foxconn makeover is in full swing, with the latest this piece from the New York Times that supposes that the world's largest ODM is worried that Apple -- yes, Apple -- might be bringing it down:

Read more...
 

Features

Managing Your ESD Program

The processes are as important as the tools.

Read more...
 
SMT Reflow Oven-to-Oven Repeatability

How to adjust an oven so a single recipe will work across multiple ovens for an individual product.

Read more...
 

Search

Search

Login

CB Login

Language

Language

English French German Italian Portuguese Russian Spanish
 

Products

ASM Releases Siplace Di Series Placement Machines
Siplace Di-Series placement machines include digital vision systems, single and dual conveyors and multi-language station software. Available with one, two and four gantries. Siplace D1i, Siplace D2i...